SAP Tips – In Billing how was condition VPRS determined?

Go to the detail display of the VPRS condition type.

  • If the condition control (KSTEU) is set to ‘H’, the cost was taken from the goods issue.
  • If it set to ‘A’, it was redetermined from the valuation segment of the material master, in case of ‘D’ or ‘E’ it was copied from the preceding document.

Leave a Reply